新火彩票计划

Product selection Your location: Home > Product selection

1

Note: The time of replacement cycle of easily damaged parts is a ballpark figure. In the practical operation process, the replacement cycle of easily damaged parts will be affected by the types of sludge, the methods of treatment, the situation of operation adjusting, and the time of daily operation. (The replacement cycle of easily damaged parts is calculated by operation time of 365 days per year and 8 hours per day)

2

Note: Flange connection will be adopted if the outlet diameter is more than DN65。

Flange standard: JB/T81-94

Pressure: l。OMpa


COPYRIGHT©Yangzhou Shangyuan Environmental Protection Technology Co., Ltd All Rights Reserved. Technical Support: Qingrui Network
188体育平台 澳门皇冠赌场网上投注 e博彩票 五龙捕鱼 万博棋牌手机版